Plug-in SolarSouth East

Plug-in Solar South East / A surface and planning check

The wall gets checked against the planning rules before any quote

Before anyone quotes, we look at where the panel would go. Brick, tile and render are usually fine. The new rules leave out weatherboard and timber balconies.

What changed in August 2026

Great Britain legalised plug-in solar on 27 August 2026. The regulations behind it were made in July 2026, amending both the plugs and sockets rules and the electricity safety rules.

The permitted development right for solar equipment on a house or a block of flats was rewritten on the same day, and plug-in solar is now named in it directly. So the answer for your home may not match what a rooftop installer told you a year ago.

There's a twelve month changeover running to 27 August 2027. Until then you can follow either the old rules or the new ones.

A flint wall with brick dressings under a tiled roof and a dormer at East Dean in East Sussex
Flint with brick dressings at East Dean, East Sussex. This one elevation has three different materials, and the rules treat each of them differently. That's the level of detail we check.

Weatherboard, hung tile and balconies

The rewritten right rules out a plug-in solar installation on a wooden wall, a balcony or timber cladding, stated once for houses and once for blocks of flats.

This comes up a lot here. Weatherboard is ordinary housing across the Weald and the Kent marshes, and hung tile and timber frame run through Surrey into Hampshire, so a timber balcony or a clad wall means you can't rely on the permitted development right.

The next question is whether a planning application is worth making, and often it isn't. The government's own assessment expects the fees and paperwork to outweigh what the kit costs and saves.

Conservation areas and listed homes

The South East has a lot of protected housing, so three situations come up often.

  • In a conservation area or a World Heritage Site, a wall facing a highway is off limits for panels.
  • Stand the panel in the grounds of a listed building, or on a scheduled monument, and the permitted development right does not apply to you at all.
  • A listed home needs both planning permission and listed building consent, so talk to the council early, before you order anything.
Flint cottages with tiled roofs along a village lane in East Sussex
A flint lane in the Sussex Downs. A lane like this can sit inside a conservation area, and if it does, the wall facing the road is ruled out whatever it's made of.

Measurements you can check yourself

A tape will settle most of this before you speak to anyone.

  • On a surface that abuts a highway, the equipment must not stand more than 200 mm proud of it.
  • On any other surface the limit is 400 mm.
  • On a pitched roof it must sit below the ridge and stand no more than 200 mm proud.
  • On a flat roof it must not stand more than 600 mm above the roof.
We do not say permission free

The right comes with conditions attached. Meet them and there is nothing to apply for. Miss one and you have to. Telling you which of the two is true for your home is the job we do.

Checking the panel is on the register

We check the panel as well as the wall. A compliant panel is type tested against G98 and listed on the Energy Networks Association's type test register, and its manufacturer holds confirmation it was assessed as compliant before going on sale. If a kit is not on that register, it has not been through the assessment.

These are the limits to know before you buy anything. The maximum apparent power to the mains is 800 VA and the maximum current is 3.5 A. You can feed it up to 2000 W of PV modules, up to four modules per inverter, with no more than two in series in any one string. A panel's wattage and its output are not the same number, so check that a listing quotes both.

What we send you

You get one email back. It names the rule that covers your surface, says what the projection limits allow at your home, and gives the figure your position would make in a year. It names the network operator too. If the right does not cover your wall, the email says so in the first line.

On this page

  1. What changed in August 2026
  2. Weatherboard, hung tile and balconies
  3. Conservation areas and listed homes
  4. Measurements you can check yourself
  5. Checking the panel is on the register
  6. What we send you

Send us your postcode

Tell us where the panel would go and what the surface is made of. We reply by email, and we say so if it will not work.

Check my address

The other two jobs

Want us to check your postcode?

Send it with the surface you have in mind and we will do the rest.

  • Kent
  • East Sussex
  • West Sussex
  • Surrey
  • Hampshire
  • Berkshire
  • Oxfordshire
  • Buckinghamshire
  • Isle of Wight

Start with your postcode

Five boxes: name, postcode, email, where the panel would go and what the surface is made of. You get one email back: the rule for your surface, a yearly figure, and which operator you're under.

We reply by email. Your postcode isn't passed to anyone and we don't take commission.